Canal house renovation in Amsterdam Canal houses renovated with respect for the building
In a canal house the logistics come before the moodboard: narrow stairs, a hoist beam, a crane permit on a busy street and timber floors on piles. We have worked on the Prinsengracht, the Bloemgracht and in the Jordaan, and we plan the route in before we draw a single cabinet.
At a glance
- Price
- Whole-home renovation of a canal house from roughly €1,500 per m²
- Permit
- Façade, windows, roof and structure need an omgevingsvergunning; about 8 weeks, monuments often longer
- Google reviews
- 4.9 / 5 from 66 reviews
Recent canal house projects
- Prinsengracht, 2026 (in progress): a whole canal house - old kitchen and bathrooms removed, ceilings opened up to the floor beams, new pipework under the floors, new stud walls, and the attic beams stripped of their old grey paint.
- Prinsengracht, 2025: an attic under the roof slopes - old built-ins removed, debris lowered in big bags through the canal-side window, new stud walls and boards for a bathroom.
- Bloemgracht, Jordaan, 2026: a bathroom and toilet stripped back to the brick with new water supply and a waterproofed shower with wall niches, and a kitchen with dark wood-grain fronts, an island and marble-patterned stone.
- Laurierstraat, Jordaan, 2024-2025: wide-plank engineered floors in long rooms, one under a skylight - a room laid and finished in three days.
- Rozenstraat, Jordaan, 2025: a bathroom taken down to the brick wall and the floor joists, with the stairwell and corridors protected.
Logistics first
Before anything is ordered we measure every stair flight, landing and door, check the hoist beam (hijsbalk) and plan how windows come out for hoisting. On narrow streets a crane, cherry picker or container needs a permit to use public space; for some addresses delivery by boat over the canal is the better route. Debris leaves in big bags, and finished materials arrive just in time, because a canal house cannot store weeks of stock.
Old timber floors and heavy materials
Canal houses sit on timber structures over pile foundations. Moving a bathroom or adding heavy stone can overstress old joists, so structural calculations come before the design is final, and temporary spreader boards protect the floors during the work.
Monuments and permits
The Grachtengordel is a protected cityscape, and many canal houses are listed monuments. Changes to the façade, windows, roof or structure need an omgevingsvergunning; a regular application takes about eight weeks and monuments often longer. A pre-application with the city's heritage team can flag problems early, and slim timber window profiles are usually the way to approval.
Planning work on a canal house? Ask for a site visit - we reply within one working day.
The same standard for a new door as for a whole house
Whether it's a new door, bespoke joinery, a bathroom or a complete home, every project gets the same attention and the same standard of work. We are not a budget contractor, and we don't compete on the lowest price.
Our clients choose us because they value:
- Workmanship and attention to detail
- Quality materials and well-thought-out solutions
- Experienced specialists and one site manager
- Clear communication from first visit to handover
- Results that last, not the cheapest short-term fix
If quality, reliability and peace of mind matter more to you than the lowest price, we would be glad to hear about your project.
For property developers we also carry out interior fit-out in premium quality.
What canal house owners ask us
Changes to the façade, windows, roof or structure need an omgevingsvergunning; a regular application takes about eight weeks and monuments often longer. In a listed building even interior changes can be regulated if they touch the heritage fabric, so we check the status of the building first.
Often not via the stairs. We measure stairs and doors first, use the hoist beam where it is sound and arrange a permit for a crane or container on the street. Debris goes out in big bags through the window, and for some addresses delivery by boat is the better route.
Often, but not without checking. Canal houses stand on timber floors over pile foundations; moving a bathroom or adding heavy stone can overstress old joists, so structural calculations come before the final design.
Yes. In a shared building the owners' association (VvE) has to agree on the use of the stairwell and façade and on protecting the common areas; we arrange that in writing before we start.
Before / after
See the transformation




Our work







Ready to plan your renovation?
Book a no-obligation first meeting about your renovation. Bathrooms from €15,000, bespoke kitchens from €25,000, whole homes from about €1,500 per m².